Indra's Energy+ Household

<

Quick Facts

General

Location <
Building Type S
Project Type N
Basis of Performance Claim Verified,
Bedrooms 4
Conditioned Floor Area 2

Energy Summary

Energy Data Type Measured,
Renewable Energy System Type(s) Photovoltaics,
Ratings
Annual renewable energy generated 1

Envelope and Mechanicals

Subslab assembly
Foundation wall assembly
Above grade wall assembly
Door Assembly
Air Changes per hour, ACH50

Project Team:

Other Team Members:

Ratings:

Awards:

Completion

Completion Date: <

Scope

Type of Construction Renovated,
Number of buildings 1
Floor area of each building 2
Bedrooms 4
Stories 1
Conditioned Building Volume 2
Conditioned Floor Area 2

Location and Climate Details

S

Address <
Location Type S
Climate Region Z
Köppen Climate Type C
Lat. / Long. P
Elevation 2
Solar Insolation 5
Annual CDD and Base Temp 3 | 8
Annual HDD and Base Temp 2 | 6

Site

Site Conditions:

previously developed land,

Site Description:

<

Monthly Energy Data and Utilities

Energy Data Type: Verified,

Electric Utility: P

Gas Utility: N

Renewables and Energy Balance

Renewable Energy Sources:Renewable energy is generated within the building footprint (e.g. solar PV on the roof),

Renewable Energy System Description & Details: 4

Annual renewable energy generated 1
Annual Renewable Energy Generated Data Type Measured,
Power Rating 1
Renewable Energy System Type(s) Photovoltaics,
Source of Annual Production Data M

Walls and Roof

Subslab assembly
Subslab R-value
Slab edge assembly
Slab edge R-value
Foundation wall assembly
Foundation wall R-value
Above grade wall assembly
Above grade wall R-value
Cathedral ceiling assembly
Cathedral ceiling R-value

Windows and Doors

Window Assembly:

Door Assembly:

Average window U-factor
Door U-Factor
Door Area

Mechanical Systems

Space cooling - Manufacturer & Model
Space heating - Manufacturer & Model
Domestic hot water - Manufacturer & Model
Domestic hot water - capacity
Ventilation - Manufacturer & Model
Lighting Manufacturer and Model
Lighting Efficiency
Mechanical Equipment Installation Details and Comments

Envelope

Air Changes per hour, ACH50
Air Changes per hour, CFM50

General Process

Design for Adaptability:

Software Tools

Software Tools:

General modeling information:

Lessons Learned

Outcome of Project Goals:

Discrepancies:

Rebates and Financial Incentives

Federal incentives
Local incentives
State incentives
Utility incentives
Other incentives
Top